Kitchen Remodeling in Austin, TX

Most kitchens worth redoing were built as closed rooms. That means the project people describe as "new cabinets and counters" usually involves taking out a wall, and that wall is usually holding something up.

Request a Free Estimate

Riccoboni Construction handles kitchen remodeling in Austin and across the Hill Country at every scale, from a cabinetry and countertop refresh through a full structural reconfiguration. One contractor sequences the whole job, from demolition through the final walkthrough.

Request a free estimate or call 512-920-2049.

What a Kitchen Remodel in Austin Involves

Structural Wall Removal and Open Layouts

Removing a bearing wall is engineering work, not demolition. It requires a beam sized for the span, posts, and a continuous load path carried down to the foundation, with inspection along the way.

Done properly, it is what turns a closed 1980s kitchen into the space people actually want, connecting the kitchen, dining, and living areas. Done improperly, it shows up as a sagging ceiling line three years later.

Utility Relocation

Moving a sink, range, or refrigerator moves supply, waste, gas, and venting with it. Older Austin homes frequently need the electrical service evaluated before a modern appliance package will run on it, and a panel upgrade is a real line item when it applies.

Our HVAC work is done in-house. Electrical and plumbing run through trades we sequence ourselves, so when one piece slips, someone resequences the rest rather than leaving you to chase it.

Interior framing and plumbing rough-in during a whole home remodeling project in Austin, TX

Cabinetry

Stock, semi-custom, and full custom span a wide range in both cost and lead time, and cabinetry is usually the largest single line item in a kitchen.

Semi-custom runs weeks. Full custom runs months. The order goes in early, which means the layout has to be settled early. Soft-close hardware, pull-outs, and a proper pantry are the details that determine whether the finished kitchen actually works day to day.

Remodeled kitchen with white shaker cabinets and a quartz peninsula

Countertops and Finishes

Countertops are templated after the cabinets are installed, then fabricated. Budget two to three weeks between those two milestones. Quartz, granite, and marble each behave differently in a working kitchen, and we will tell you honestly which one suits how you cook.

Person installing a white kitchen cabinet with a protected countertop and backsplash area

What a Kitchen Remodel Costs in Austin

Every project is different. Answer a few quick questions and we will show you a typical cost range for your scope.

Get Your Kitchen Cost Range

The variables that move the number most: whether a wall comes out, how far the plumbing moves, cabinetry grade, countertop material, and whether the electrical panel needs replacing. Two kitchens of identical size can differ by a factor of three on those choices alone.

How Long a Kitchen Remodel Takes

Six to twelve weeks on site for most kitchens, once demolition starts.

What people underestimate timeline wise is everything that comes before that. Design, selections, and permitting typically add four to eight weeks, and cabinetry lead times can extend it further. A project that starts in March was usually scoped in January.

We will give you a realistic number at estimate time rather than an optimistic one. We know how important it is to have a fully functioning kitchen.

How the Project Runs

1. Consultation. We walk the kitchen, look at what is behind the walls where we can, talk through what is and is not structurally possible, and get a sense of budget before anyone draws up any plans.

2. Planning and selections. Layout, structural drawings where required, utility routing, and material selections. Selections get locked before demolition, because deciding late is the most common reason a finished project runs past its date.

3. Construction. Demolition, structural work, rough-in, inspections, then finishes in that order.

4. Walkthrough. We go through it with you. Cabinet alignment, countertop seams, hardware, switches, and a punch list we complete.

Kitchen Remodeling Questions

Do I need a permit to remodel my kitchen in Austin?

Generally yes, for anything structural, electrical, or plumbing. Cosmetic work is a different case. Requirements vary by jurisdiction, and Austin, West Lake Hills, Bee Cave, and Dripping Springs each run their own review. We confirm which authority applies to your address and handle the submission.

Can I stay in the house during a kitchen remodel?

Most people do. You will be without a kitchen the whole time, so plan for a temporary setup somewhere else in the house.

Is it worth removing the wall?

Usually, if it opens the kitchen to living space and light. Sometimes not, if the load path makes it disproportionately expensive relative to the benefit. We will tell you which one you have before you spend money on drawings.

How far ahead should I schedule?

Further than you think. Between selections, permitting, and cabinetry lead times, most kitchens are booked two to four months before demolition begins.

Do you work outside Austin?

Yes, we serve Austin, Dripping Springs, Westlake, Lakeway, Bee Cave, and the surrounding areas.

Start Your Kitchen Remodel

Tell us what is not working. We will walk the kitchen, talk through what is possible, and give you a real price range for the changes you want to make.

No charge, and no obligation afterward.